6,000+ sq. ft. epoxy quartz system installed at Pueblo Central High School—built to handle heavy foot traffic.
8,000 sq. ft. of stained and polished concrete—designed for commercial use.
10,000 sq. ft. of polished natural concrete installed in a Skechers Shoe store—durable and built for commercial use.
3,000 sq. ft. of metallic epoxy installed at the ProRodeo Hall of Fame—durable, sleek, and built to impress.
5,000 sq. ft. of overlay and stain installed in a downtown Colorado Springs office building— made for daily use.
16,000 sq. ft. of natural polished concrete installed at Ace Hardware in Colorado Springs—strong, clean, and built to last.